Tuesday, November 27, 2007

Details, Details

The end is near! The bank inspector has been in and declared the house 100% complete. However the county building inspector had a few things he wanted corrected before he would issue the "Occupancy Certificate", which is required for the final bank payment to be issued.

Issues that require final completion and correction include : (1) higher handrail on the stairway from the main floor to the second floor; (2) handrails on the basement steps; (3) handrails on the steps to the 2 porches from the front door and the deck; (3) more strapping and bracing here and there; (4) and a couple more small items I can't remember.


I also need to get a copy of the final septic certificate from the installer, and a water test.


Al seems OK. Here are a few recent pictures :


Living and dining rooms, taken from the kitchen.















Master Bedroom, taken from the doorway to the deck.












Master ensuite, taken from the doorway to the shower.














Powder room off the main front hallway, near the front door.
















Guest bedroom on the second floor.















Main entry of the house, with the handrails installed from the porch and from the deck.











All for now!

No comments: