Sunday, October 28, 2007

Stairs From Deck + 2nd Floor Insulation


The last full week of October saw some progress, but it is now seeming slowwwwww as I await completion. The stairway from the back of the house down to the yard were started.












I got the bed set up in the master bedroom, along with a small stereo system and a reading lamp, plus a couple of night tables, and I spent my first night in the new house!!











Toward the end of the day on October 26, a load of cellulose insulation arrived on a truck, along with the machine to blow it into the attic space above the second floor. Gerald was the lucky one to go up in the attic with the hose, and Steve kept the hopper loaded with insulation as it was blown in.