Monday, July 9, 2007

And Then there was a floor - and a wall - and a phone!

With variable weather (read as "cloudy, cool, and threatening rain on a continuous basis), Dave and his crew (Gerald, Steve, and Jeremy) made some good progress, getting the main floor covered and one wall erected by mid-day on Monday July 9th. And on the same day, the Aliant telephone people came and ran the wire from the street to the pole, and through the conduit underground to the inside of the garage. There will be another run of wire from that point, through another conduit, to the basement of the house. Pics and video as follows :












It was a windy evening on July 8th

The first wall was in place July 9th