


The basement walls that are above ground level had to be insulated to meet local building code requirements.

Here's a shot of the deck with some of the new railing, taken from the future doorway to the screen porch.

This shot is taken from the area where the septic field was installed. The river is beyond the house and the tall line of trees.

Jeremy and Steve are finishing up some of the trim work outside the master bedroom.

Another shot of the new railing along the deck, from up close.......

And from back a bit - this is how it looks when you come in the driveway.