Monday, September 10, 2007

Ready for a Floor

We are now well into September, and the outside of the house almost looks like a finished house. The siding is virtually complete, and the railing has been started around the decks. Also, Eric the plumber has been in and prepped the floors for the cement to be poured, which is supposed to happen on September 11th. Here's a few recent shots.







This shot is of the radiant PEX tubing installed in the master bathroom. The farthest away area is the shower.














The basement walls that are above ground level had to be insulated to meet local building
code requirements.
















Here's a shot of the deck with some of the new railing, taken from the future doorway to the screen porch.












This shot is taken from the area where the septic field was installed. The river is beyond the house and the tall line of trees.








Jeremy and Steve are finishing up some of the trim work outside the master bedroom.












Another shot of the new railing along the deck, from up close.......













And from back a bit - this is how it looks when you come in the driveway.